Combining the best of SAP and Siemens.
This is an end-to-end example of how to integrate S/4HANA and Teamcenter, using Version BOMs with Model Unit Effectivity, VEMP Handover and PEO Shopfloor Routings.
Links for further information:
- The blogs on PLM System Integration: https://sap.to/6050ROrYq
- PLM system integration for SAP S/4HANA (Admin-, Configuration-, and Security Guides): https://sap.to/6051ROrYS
- PLM Product Page: https://sap.to/6052ROrYs
Contact Thomas Elsässer:
[email protected]
TIMESTAMPS:
00:00 Introduction
03:54 Create a Change Notice and import files from NX
05:42 Set Element Effectivity
07:00 Complete Change Notice
07:34 Check Monitoring Logs on Teamcenter
10:04 Open Change Notice in SAP to create MBOM
11:17 Prepare MBOM creation in engineering snapshot
12:04 Create MBOM as a Version BOM
12:27 Create Manufacturing Change Record and launch VEMP Manufacturing Planner to turn EBOM into MBOM
14:38 Create new Shop Floor Routing
16:40 Trigger Change Process
17:41 Change Status to trigger communication with Teamcenter
18:38 Transfer Heavy Rocket to SAP – Create Change Request from Problem Report
19:41 Derive Change Notice from Change Request
20:44 Import New Parts for Heavy Rocket
21:20 Replace New Components
23:58 Adjust Element Effectivity to 5-UP
25:28 Complete Change Notice
25:58 Update MBOM in SAP
27:24 Launch VEMP Manufacturing Planner to update MBOM
30:13 Update Shop Floor Routing for new Rocket Heavy