Reed 5T Tonearm Assembly and Mounting

Reed 5T Tonearm Assembly and Mounting

5.344 Lượt nghe
Reed 5T Tonearm Assembly and Mounting
This video demonstrates the assembly and mounting of the Reed 5T tonearm. We recommend to turn on subtitles in English for additional explanations! 0:05 Tonearm unpacking 0:43 Tonearm assembly 1:46 Tonearm mounting 4:49 Vertical Tracking Force (VTF) adjustment 5:35 Vertical Tracking Angle (VTA) adjustment 6:07 Azimuth adjustment 6:51 Armtube replacement 8:06 Loosening of armwand base pad 8:15 Power supply unboxing 8:45 Connecting power supply to the tonearm 9:00 Tonearm operation