A 95 meters long and overall 592 tons heavy formation transported a 260 tons heavy transformer from Leer to a distribution station near Conneforde, Germany. For this, the High Girder Bridge of the Kahl Heavy Haulage corporation was applied. The transformer came by a barge on the Ems river (
https://youtu.be/_XOj5PBG51I).
*This is part 2 of a threepart series about the transformer transport from Leer to Conneforde:*
◾️ Part 1: Unloading the transformer off the barge:
https://youtu.be/_XOj5PBG51I
◾️ Part 2: Departure of the 592 tons heavy Transformer Bridge
◾️ Part 3: Conversion of the Transformer Bridge:
https://youtu.be/PUqYmZOXejM